Design / Engineering Report

Document Reference

Design / Engineering Report

Engineered plan set and design package for the project.

M1, M2 if change order ResidentialCommercial

Source

Partner-submitted

Submitted By

EPC

Usage Note

Required at M1 and again at M2 if a change order occurred.

Must Contain

  • System layout.
  • Electrical design details.
  • System size and equipment matching the PPA and BOM.

Common Mistakes

  • Design does not match the BOM.
  • Change order design not submitted after production changes.