Approved PTO Document from Utility

Document Reference

Approved PTO Document from Utility

Utility permission-to-operate authorization confirming the system is approved to interconnect and operate.

M3 ResidentialCommercial

Source

External-generated

Submitted By

Utility

Usage Note

Full PTO is what unlocks M3; interim or conditional PTO may not be sufficient.

Must Contain

  • Issued by serving utility.
  • System owner or address matching the PPA.
  • PTO grant date.

Common Mistakes

  • Submitting interim or conditional PTO.
  • Waiting too long after M2.